hannahgrace31511 hannahgrace31511
  • 03-11-2021
  • Mathematics
contestada

A chef can finish a catering job in 4hr. His student can do the same job in 12hr. How long will it take them both to do the job if they work together

Respuesta :

shayy1616 shayy1616
  • 03-11-2021
12 divided by 4 equal 3
Ans:3hrs
Answer Link

Otras preguntas

Offering 50 Points!! Please help!! Translate into an algebraic expression: What percentage sugar do you get if you turn 40g of sugar into x grams of syrup ?
Advertising decision-making involves deicisions about which five components?
The 9officers of the student council are going on a trip to an amusement park each student must pay an entrance fee plus $5.00 for meals the total cost of the t
Who was the 21st president of the United States of America
You have been asked to lock a database. to do this you would, open the backstage view, click the save as tab, and then click ____ in the advanced area.
A neonate born by cesarean at 42 weeks' gestation, weighing 4.1 kg (9 lb), with apgar scores of 8 at 1 minute and 9 at 5 minutes after birth, develops an increa
4. Suppose an investment of $s1.800 doubles in value every 7 years. How much is the investment worth after 42 years?
6160÷540 I need a whole number with a remainder.
what is the sum of all the even numbers from 20 to 70
plot the given point in a rectangular coordinate system (3,0)