krishnashrrstha41
krishnashrrstha41 krishnashrrstha41
  • 04-08-2021
  • Mathematics
contestada

15men can complete a piece of work in25days. how many men should be added to complete the same work in15days.​

Respuesta :

mhanifa
mhanifa mhanifa
  • 04-08-2021

Answer:

  • 10 men

Step-by-step explanation:

Amount of work done by 15 men is:

  • 15 men *25 day = 15*25 man*days

Same work can be done by 25 men, in 15 days, so 10 more men should be added.

Answer Link
abovejosh
abovejosh abovejosh
  • 04-08-2021
Answer: 10 men explanation: guy above me
Answer Link

Otras preguntas

which mountain range is located east of the Mississippi river
What's 4/12 reduced too
The length of a rectangle is twice its width, the perimeter is 126 fee. h
Which of these is a natural monopoly? Cell phone service Computer repair Package delivery service Sewage treatment
It is often easier to determine if an object or organism possesses the characteristics of life rather than life itself. a. true b. false
If five slices of pizza cost $5.50 how much did two slices cost 10 slices have a slice
rename the number 120,000
Write a sentence that compares the values of the nines in the number 69.92.
What is the missing Exponent? (2^-5)_______=2^-15
Four more than the product of 3 and x is less than 40