explain the relationship between costs in the short run and costs in the long run. and define the "short run" means.

Respuesta :

glangille98
glangille98 glangille98
  • 02-04-2021

Answer:

The short run is a concept that states that, within a certain period in the future, at least one input is fixed while others are variable. ... The short run does not refer to a specific duration of time but rather is unique to the firm, industry or economic variable being studied.

Explanation:

i think this is it i hope it helps

Answer Link

Otras preguntas

Why was it important for the people of Vedic Age to write down their history?
Landmark buys $300,000 of SRW Company's 8%, 5-year bonds payable, at par value on July 1. Interest payments are made semiannually on December 31 and June 30. Th
20 points pls be fr will mark brainliest
My dog whom I've had since before I was born is about to die. Does anyone have any help or tips? Thank you so much for helping. This means a lot.
What information can be determined directly by analyzing seafloor drill cores? (Select all that apply.)
Fill in the blanks with numbers that correctly complete the statement. Three integers between -4 and 0
what is the slope line ​
How are ocean waves formed? gravity energy transfer conduction radiation​
2x + 3y + 6 > 0????????​
Solve -3x is less than or equal to 9 by adding 3x to each side of the inequality first. Then solve the resulting inequality.