reesealexnader1227 reesealexnader1227
  • 03-12-2020
  • Computers and Technology
contestada

When multiple architects work on a construction plan, which section of a construction plan will help them keep track of when the changes are made and by whom?
A.
framing plan
B.
schedule
C.
title block
D.
bill of materials

Respuesta :

katusukibakugoisgod
katusukibakugoisgod katusukibakugoisgod
  • 07-12-2020

Answer:

I believe that it is . A. framing plan

Explanation:

But I am not certain But I do know that it IS NOT B..

Answer Link
ewachi101 ewachi101
  • 26-08-2021

Answer:

the answer is schedule!!!

Explanation:

Answer Link

Otras preguntas

What is the distance between A(5,4) and B(2,-3)
can you plz show me an 3D isometric drawing of a grain crusher project​
What is the volume of a sphere with a radius of 5 in? Round your answer to the nearest hundredth. 525.1 cubic inches 523.6 cubic inches 261.8 cubic inches 287.4
sorry about the bad photo. I really need help.​
ppplllzzz hhhheeelllllllpppppp​
PLSSSSS HELPP MEEEEeee
why should the teacher praise socially cooperations interactions?​
solve the following for y: -6 +2y = 8
Which of the following would be considered a benefit of overpopulation A the increase in genetic variation of a population B the exponential growth of a popula
what if any action should the world take in order to deal with isis?