sr9376328
sr9376328 sr9376328
  • 02-12-2020
  • Mathematics
contestada

men can do a work in 32 days in how many days will 24 men complete the same work​

Respuesta :

Аноним Аноним
  • 02-12-2020

Answer:

It will take 32/24, or 1 1/3 days, for 24 men to get the job done.

Step-by-step explanation:

Answer Link

Otras preguntas

How does the narrator of "Araby" usually spend time in the evening with his friends?
if the pH of a solution is 7, what is the pOH?
The length of a rectangle is equal to triple the width. Write a system of equations can be used to tind the dimensions of the rectangle if the perimeter is 98 c
for earlobes only, how many students in your class do you think will share the same form (free or attached) as you? biology observing human traits lab
Help, I need answer for this, and I don’t understand
Find the area of each polygon each square on the grid represents 1 square centimeter the answers are mixed up at the bottom of the page cross out the answers as
how was your eye color determined
What is a limited liability company (LLC)?
I need help! This pattern repeats every 4 terms. The pattern is square, hexagon, trapezoid, triangle. What is the shape in the 7th term of this pattern?
Round 1 637, 984 off to: c) the nearest tenth​