A can do a piece of work in 20 days and B can do it in 12 days,B work for 9 days,in how many days A alone can do the work​

Respuesta :

roseheart889 roseheart889
  • 03-09-2020

Answer: 9

Step-by-step explanation:

Answer Link

Otras preguntas

the __ is a lining of photoreceptors and neurons on the back inner surface of the eye
What is the main difference between a gas and a plasma?
what is the area if a triangle formula
Tim is buying packages of paper plates and cups. He wants to have equal amounts of each, but plates come 24 per pack, and cups come 16 per pack. What is the lea
I am stuck on this. Please help!
what is the lcd of 2/5 and 7/10? 10 80 20 40
Ben made some apple pies. For every 4 cups of butter, he added 3 cups of water. The ratio of butter to water in Ben's apple pies is ____.
which of the following is a true statement about early American cultures
Perform the following division (-1/6) ¥(3/7)
The sum of the angles in a convex 10-sided polygon is: 1800° 188° 3600° 1440°