Mixedemotions1150 Mixedemotions1150
  • 04-03-2020
  • Computers and Technology
contestada

A critical activity is________________.a. an activity that consumes no time but shows precedence between events. b. a milestone accomplishment within the project. c. an activity with zero slack. d/ the beginning of an event.

Respuesta :

Ritmeks
Ritmeks Ritmeks
  • 09-03-2020

Answer:

C

Explanation:

Critical activity is the sequential activities from beginning to the end of a project. A lot of projects have a single critical path, although some projects may have more than one critical activity which depends on the flow logic utilized in the project.

Answer Link

Otras preguntas

Please answer please!! Please answer 1–4 please actually answer please I need thissss
When a mixture of rock pieces, salt and water is filtered, what will be found as the filtrate and what will be found as the residue
hi What do you do At the week end ? 5 line paragraph thank you ;) ​
helpdisdalastquestio
Complete the following statement. Percent is a fraction where parts make one whole.​
Please solve this[tex] {2}^{2x + 2} + 8 = 33( {2}^{x} ) [/tex] indicial equations​
In 2003, the average combined SAT score (math and verbal) for college-bound students in the United States was 1026. Suppose that approximately 45% of all high s
What is the difference in su icide rates between individuals suffering from a mood disorder and individuals who are not?
Seven year old students at a elementary school were given 10 yard
I need help- if a ladder is to reach a height of 5.6m, the base must be at least 1.4m from the wall. How long should the ladder be in order to meet this safety