liluv4590 liluv4590
  • 02-04-2019
  • Mathematics
contestada

A potter works 4 days a week, makes 14 pots per day on average, and charges $24 a pot. Money per 4-day workweek?

Respuesta :

greubel80
greubel80 greubel80
  • 02-04-2019
Step by Step:

14 average pots x 4 days a week = average money made

14x4= 56

56 pots a 4-day week x 24$ a pot

56x24 = 1344$
Answer Link

Otras preguntas

please open the lead of the water bottle into passive
4d+5d-6+3d-4d+5 Terms Like Coefficient Canstants
Simalirities between procedural text and nonprocedural text
Medicare is a welfare program, and eligibility is determined based on income level.a) Trueb) False
Write a division number story with an answer of 1/3
△ ABC and △ DEF are similar. The length of the smallest side of △ ABC is 2 units and the length of the smallest side of △ DEF is 5 units. The area of △ ABC is 4
Solve 2-8 12-18 Evens only
Why John Glenn's 1998 Comeback To Space Became The Sparkplug For The Rise Of High Definition Television For Live News Coverages In The United States In 1998?
Explain who settled each of the british colonies and why
What’s the next number