batshonnicole
batshonnicole batshonnicole
  • 02-01-2019
  • Mathematics
contestada

Six people paint the fence and 15 hours how long would it take five workers to do the same job

Respuesta :

somaiasult2006
somaiasult2006 somaiasult2006
  • 02-01-2019
it will take 12.5 hrs for five workers to do the same job.


steps:

15 × 5 = 75

75 ÷ 6 = 12.5
Answer Link

Otras preguntas

Henry divided his socks into five equal groups. Let s represent the total number of socks. Which expression and solution represent the number of socks in each g
The lack of farmland caused the Greeks to get their goods from where
Please help me Its due tommrow and it's major
Sandra needs 6 pieces of rope, each measuring 8 inches in length. She is going to cut the 6 pieces from a rope that is 84 inches long. How much rope will remain
A high surface tension results from _____. Need asap...
An important part of the free enterprise system is the belief that _____.
At what temperature will the water in each of these jars reach thermal equilibrium?
which reaction leads to the formation of a precipitate?
In what ways did European colonists discriminate against Africans
Which statement is sufficient evidence that ∆DEF is congruent to ∆ABC?